JOEL KLEMMER
Research & Sources

Program Organizational context

American River Common Features levee upgrades

USACE Sacramento’s public materials describe the American River Common Features flood-risk and mitigation work, including a 2023 levee-improvement contract.

The record

USACE Sacramento announced a $27.575 million contract in January 2023 for more than 2.6 miles of improvements at five sites along the Sacramento River East Levee. The agency identified the work as part of its Sacramento levee improvement activity.

USACE’s public project materials describe American River Common Features as flood-risk work addressing levee erosion, seepage, stability, and overtopping, with associated habitat mitigation. A 2022 solicitation for Lower American River Project 2 described bank protection and riverbank-and-levee stabilization work.

Sources

  1. USACE awards $27.5 million contract for 2023 levee improvement work along Sacramento River East Levee

    U.S. Army Corps of Engineers Sacramento District ·

  2. Sacramento Levee Upgrades Mitigation

    U.S. Army Corps of Engineers Sacramento District

  3. American River Common Features (ARCF) Erosion Control, Lower American River Project 2

    SAM.gov ·

JOEL KLEMMER

Accessibility

Accessibility

Save these choices in this browser. Turning this off clears saved settings; your current choices stay active until you reload.